Jump to content

Welcome to eMastercam

Register now to participate in the forums, access the download area, buy Mastercam training materials, post processors and more. This message will be removed once you have signed in.

Use your display name or email address to sign in:

Tool priorities


G Caputo
 Share

Recommended Posts

Hi all,

 

I did a search in here but i couldn't find the answer I was looking for, so I hope someone can be of help. I am making 12 parts of "A" and 4 parts of "B". What I have been doing is making 2 at a time of the same part. I have a program and have been transforming the program by coordinate and operation type at a 22" Y spacing to produce two identical parts. Well now shipping dates are becoming an issue and we need 3 part A's and 1 part B. So, are production engineer tells me to do the parts this way. He's a mazak guy all the way and he tells me just to prioritize the tools. Is this possible with MC? At most we are going to lose is 10 minutes of tool change time, so if this would become a complicated mess, I am all for letting them run 1 at a time. I was just wondering if there was an easy way to go about doing this. confused.gif

 

Thanks,

Greg

Link to comment
Share on other sites

Sorry, I guess I need to clarify myself. I am not running a mazak at all. The production engineer used to run mazak's and he was the one talking about tool priorities. I was just wondering if there was a way to take 2 programs and translate 1 of them 22" on the Y and then let mastercam decide what operations it can do while the tool was out and apply them to 2 different programs to create 1 NC program. confused.gif

 

Greg

Link to comment
Share on other sites

Hi

 

You can create a separate transform operation for each of your tools that has more than one operation. This will create a program that runs all the operations of the first tool on each part before changing tools,

 

Hope this helps.

 

Eric

Link to comment
Share on other sites

I don`t know if it helps but you can do this :

1. Save your file under other name for a backup.

2.operation manager -> transform your parts as needed.

3. in operation manager with a right mouse click -> sort operations ->by tool number.

The first stage is needed because of this

 

A quote from thread

:

quote:

Operation aren't always created in order and there is no (easy) way to reset it.

 


Iskander : there is always a way ... cheers.gif

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.

Join us!

eMastercam - your online source for all things Mastercam.

Together, we are the strongest Mastercam community on the web with over 56,000 members, and our online store offers a wide selection of training materials for all applications and skill levels.

Follow us

×
×
  • Create New...